Another little project
/back in September, i bought a few skiens of Noro Silk Garden, theoretically to do mittens with.
Well, nearly seven months later, i finally started (and finished) them.
These are two separate colorways of Noro, which has a built in long color change stripe. I knit two rows with each skein, carrying the unused yarn up as I went.
There are many mitten patterns around, and I generally use my fairly standard made up mittens recipe:
For heavy worsted, on size 5 double pointed needles, cast on 36 stitches, knit in 2x2 rub for a while. I like long cuffs, so i did a few stripe repeats here.
Switch to knit, and knit about an inch or so. Then begin the thumb gusset by increasing one stitch on either side of the first stitch of the round every other round until you have 13 stitches for the thumb. (Here, I actually did a slower increase of every 4 rounds, which pushes the ribbing farther down the arm).
Put the thumb stitches on waste yarn, cast on one stitch over the gap and work until you're about half an inch from the tips of your fingers. Decrease at 6 points around (divide stitches evenly over three needles and put your decrease points at the middle and ends of each needle), every other row until half your stitches are gone. Then decrease every round until you're left with 6 stitches. Pull the yarn through the 6, and fasten off.
Finish your thumb. Put the held stitches on the dpns, and join yarn. Pick up three stitches over the gap and knit until just below the length of the thumb. K1, k2tog around. K plain. K2 tog around and pull yarn through and fasten of